- Fri, 28 Mar 2025
EN
FA
Sign In
راهنما
Toggle navigation
Home
Profiles
Departments
Scholarly Works
Behdin Vahedi-Nouri
Academic Rank : Assistant Professor
College of Engineering / Faculty of Industrial Engineering
Email
Resume
Download
663
Citations
17
h-Index
as of :
2025-03-15
896
Citations
20
h-Index
as of :
2025-03-17
Overview
Fingerprint
Network
Scholarly Works
Grants
Prizes
Laboratories
Offered Courses
Consult Time
Scholarly Works
2012
2025
663
Citations
17
h-Index
19
Article
6
Conference
Scholarly Work Per Year
1 - 25 from 25 Result
Publish Date (Descending)
Publish Date (Descending)
Title (Ascending)
Type (Ascending)
Publish Date (Descending)
Title (Ascending)
Type (Ascending)
2025
1. A matheuristic approach for an integrated lot-sizing and scheduling problem with a period-based learning effect
Rouhaninejad Mohammad,
Vahedi-Nouri Behdin
,
Tavakkoli-moghaddam Reza
, Hanzalek Zdenek (2025)., EXPERT SYSTEMS WITH APPLICATIONS, 269(-).
2024
1. An optimization model of a bread supply chain with the circular economy
Aminian Asal,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
, Tafakkori Keivan, Rahmani Mohammad (2024)., The 51st International Conference on Computers and Industrial Engineering (CIE51), 9-11 December, Sydney, Australia.
2. A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0
Bakhshi-Khaniki Hessam,
Tavakkoli-moghaddam Reza
, Hanzalek Zdenek,
Vahedi-Nouri Behdin
(2024)., the Advances in Production Management Systems (APMS 2024), 8-12 September, Berlin, Germany.
3. An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints
Rouhaninejad Mohammad,
Vahedi-Nouri Behdin
, Hanzalek Zdenek,
Tavakkoli-moghaddam Reza
(2024)., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 62(11), 3994-4013.
4. Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration
Vahedi-Nouri Behdin
,
Tavakkoli-moghaddam Reza
, Hanzalek Zdenek, Dolgui Alexandre (2024)., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 62(3), 767-783.
2023
1. A Constraint Programming Model for a Reconfigurable Job Shop Scheduling Problem with Machine Availability
Mahdizadeh Zahra,
Tavakkoli-moghaddam Reza
, Rouhaninejad Mohammad, Hanzalek Zdenek,
Vahedi-Nouri Behdin
(2023)., Advances in Production Management Systems (APMS 2023), 17-21 September, Trondheim, Norway.
2. New products or remanufactured products: Which is consumer-friendly under a closed-loop multi-level supply chain?
Taleizadeh Ata Allah
, Moshtagh Mohammad Sadegh,
Vahedi-Nouri Behdin
, Sarkar Biswajit (2023)., Journal of Retailing and Consumer Services, 73(103295), 103295.
3. A bi-objective home care routing and scheduling problem considering patient preference and soft temporal dependency constraints
Oladzad Abbasabady Nastaran,
Tavakkoli-moghaddam Reza
, Mohammadi Mehrdad,
Vahedi-Nouri Behdin
(2023)., ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 119(1), 105829.
4. A multi-objective tour routing problem considering the time window and tourist utility
Shahbazi Mohammad,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
(2023)., Industrial Engineering & Management Sharif, 38(2), 108-99.
5. Scheduling of Multi-Robot Job Shop Systems in Dynamic Environments: Mixed-Integer Linear Programming and Constraint Programming Approaches
Fatemi Anaraki Soroush,
Tavakkoli-moghaddam Reza
, Foumani Mehdi,
Vahedi-Nouri Behdin
(2023)., OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 115(1), 102770.
2022
1. A data-driven multi-criteria decision-making approach for assessing new product conceptual designs
Arbabi Hamidreza,
Vahedi-Nouri Behdin
,
Eiranmanesh Seyed Hosein
,
Tavakkoli-moghaddam Reza
(2022)., PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 236(14), 1900-1911.
2. A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines
Rohaninejad Mohammad,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
, Hanzalek Zdenek, Shirazian Shadi (2022)., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 60(20), 6205-6225.
3. Workforce planning and production scheduling in a reconfigurable manufacturing system facing the COVID-19 pandemic
Vahedi-Nouri Behdin
,
Tavakkoli-moghaddam Reza
, Hanzalek Zdenek, Dolgui Alexandre (2022)., JOURNAL OF MANUFACTURING SYSTEMS, 63(1), 563-574.
4. Bi-objective collaborative electric vehicle routing problem: mathematical modeling and matheuristic approach
Vahedi-Nouri Behdin
, Arbabi Hamidreza,
Jolai Fariborz
,
Tavakkoli-moghaddam Reza
,
Bozorgi-Amiri Ali
(2022)., JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 1(1).
2021
1. Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach
Fatemi Anaraki Soroush,
Tavakkoli-moghaddam Reza
, Abdolhamidi Dorsa,
Vahedi-Nouri Behdin
(2021)., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 59(24), 7576-7593.
2. Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods
Vahedi-Nouri Behdin
,
Tavakkoli-moghaddam Reza
, Hanzalek Zdenek, Arbabi Hamidreza, Rouhaninejad Mohammad (2021)., INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 59(7), 2009-2027.
3. A mathematical model for integrated operating room and surgical member scheduling considering lunch break
Hamid Mahdi,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
, Arbabi Hamidreza (2021)., International journal of Research in Industrial Engineering, 9(4), 304-312.
2020
1. A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time
Dorfeshan Yahya,
Tavakkoli-moghaddam Reza
, Mousavi S. Meysam,
Vahedi-Nouri Behdin
(2020)., APPLIED SOFT COMPUTING, 91(1).
2. Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach
Mokhtarzadeh Mahdi,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
, Farsi Azadeh (2020)., INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 33(5), 460-473.
3. A multi-objective model for a nurse scheduling problem by emphasizing human factors
Hamid mahdi,
Tavakkoli-moghaddam Reza
, Golpayegani Fereshte,
Vahedi-Nouri Behdin
(2020)., PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART H-JOURNAL OF ENGINEERING IN MEDICINE, 234(2), 179-199.
2019
1. Integrated waterway scheduling, berth allocation and quay crane assignment problem by using a hybrid flow shop concept
Tavakkoli-moghaddam Reza
, Fatemi Anaraki Soroush, Abdolhamidi Dorsa,
Vahedi-Nouri Behdin
(2019)., the 8th Int. Conf. on Industrial Engineering and Systems Management, 26-28 September, Shanghai, China.
2. Energy-aware permutation flow shop scheduling problem considering the inventory, tardiness and energy costs
Fallah Mohamad, Benvidi Sara,
Tavakkoli-moghaddam Reza
,
Vahedi-Nouri Behdin
(2019)., the 8th Int. Conf. on Industrial Engineering and Systems Management, 26-28 September, Shanghai, China.
3. A multi-objective scheduling model for cloud manufacturing system considering pricing, equity, and order rejection
Vahedi-Nouri Behdin
,
Tavakkoli-moghaddam Reza
, Rouhaninejad Mohammad (2019)., the 9th IFAC Conference on Manufacturing Modelling, Management and Control, 28-30 August, Berlin, Germany.
2014
1. A general flow shop scheduling problem with consideration of position-based learning effect and multiple availability constraints
Vahedi-Nouri Behdin
, فتاحی پرویز,
Tavakkoli-moghaddam Reza
, Ramezanian Reza (2014)., INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 73(5-8), 601-611.
2012
1. Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints
Vahedi-Nouri Behdin
, Parviz Fattahi, Mohammad Rohaninejad,
Tavakkoli-moghaddam Reza
(2012)., APPLIED MATHEMATICAL MODELLING, -(---), -.
×
Article File